 
|
 |
Recent
history of Metrô planning
|
1990: the last refence
network (> opposite, top)
45km and planning and building stops (> below)
1994-2003: lost
stretch in periphery without plan
1997 Start of PITU
2020 |
Main issues
|
See
1:3 Prod urb space  |
Alternative Metrô
network designs
|
Spread over urban
structure (> opposite, bottom)
Concentrated in
SW sector/ Hyperconcentrated idem |
São
Paulo, 1997-2002 |
 |
Bibliography.
MUT;
Deák (1990) |
Metrô
reference network: 1990 (top) and 97-99 (PITU, bottom). |